Ospedale Salvini

Part of a 130,000 sq m complex, the new Salvini Hospital in Garbagnate Milanese is an example of architectural and technological excellence.

ospedale-salvini-interno

The facility consists of 3 above-ground levels, and an additional floor housing technological systems. Three underground levels accommodate employee and visitor parking lots. The new hospital includes an Emergency Room, diagnostics department, operating rooms, and delivery rooms, with a total of 500 beds; it also includes conference rooms and training, reception, and commercial areas.

Teleimpianti S.p.A. created the executive project and engineered the building management system  for the conditioning, heating and ventilation plants.

It is one of Europe’s biggest and most complex projects concerning building automation and management systems.

Comfort and energy saving are obtained by using cutting-edge heat management technologies (recovery refrigerator groups, absorption refrigerator groups, steam co-generators, dual-fuel boilers) and a complex cooling system (evaporative cooling towers, stockpile and disposal pits).

Teleimpianti has designed and built:

Control, Technological Supervision and Telecontrol of:

3 dual-fuel boilers with a 4000Kw power each

7 refrigerator groups (500 to 3500kW) with integration of 500 Modbus points

2 1MW co-generators

60 ATU (air treatment units)

7 operating rooms (pressure, humidity, temperature, alarms)

80 hydraulic circuit pumps

Regulation of stockpile hydro-tanks

Sanitary water, solar panel circuit

photovoltaic system and weather station

120 controlled doors

intrusion alarms

Follow us

© Copyright 2022 Teleimpianti S.p.A. - All Rights Reserved | REA BO-218734, P. IVA e CF 00550400378 e Capitale Sociale 500.000,00 - Privacy policy - Cookie policyCredits

chevron-down
linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram